PROJECTS
HYDROPOWER Projects
Nam Lik Keng Luang Hydropower Project 39 MW Vientiane Province, Lao PDR
Date:2016-2017
Employer: Guangxi Water and Electric Power Construction Group Co., Ltd
CHINA
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Monitoring and Management Plan (EMMP)
Nam Siem Hydropower Project 5MW, Xiengkhouang Province, Lao PDR
Date:2016
Employer: JVC GROUP OF LANEXANG CONSTRUCTION AND TRADE IMPORT CO., LTD. (JV LXCT-TSC-ECC)
CHINA
Assignment: Initial Environment Examination (IEE) and Environmental Monitoring and Management Plan (EMMP)
Nam Ang Hydropower Project, 49 MW in Sanxay district, Vientiane Province
Date: 2012-2013
Employer: VELCAN ENERGY,(French developer ) and ECI (Electrical Construction and Installation State Enterprise)
Assignment: Initial Environment Examination (IEE) and Environmental Monitoring and Management Plan (EMMP)
Nam Phouan Hydropower Project, 52 MW located in the Nam Phouan River, Hom District, Vientiane Province
Date: 2011-2012
Employer: VELCAN ENERGY (French developer) and ECI (Electrical Construction and Installation State Enterprise)
Key Assignment: The Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP) to identify environmental impacts, during construction and operation and to assure that the project will be environmentally feasible
Nam Mo Hydroelectric Power Project 120 MW, Mok District, Xieng Khouang province, Lao PDR.
Date:2010-2011
Employer: The Hanoi Construction Investment Trading and Technology Joint Stock Company, the Vietnamese developer.
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP), Identification of the potential impact on their asset, land use, livelihood and compensation cost of six villages, namely: Ban Na Khorne, Ban Xieng Men, Ban NamOne,Ban Mor, Ban Nam Yiem,/Nam Xong,Ban Nam Ngat.
Nam Theun 1 Hydropower Project,( NT1 HPP), 474 MW in Bolikhamxay Province, Lao PDR.
Date:2007-2008
Employer: Gamuda Bhd., Malaysia and EGCO Thailand
Assignment: Population Registration and Asset Assessment of in the 13villages in Vieng Thong district, six is totally inundated and seven is partially inundated.
- Conducted socio-economic data household by household .The total population of the thirteen affected 13 villages are 6,759 people who their land area and assets impacted by the reservoir impoundment.
- Preparation of Household Asset Certificates certified by house owner and local authorities.
- Surveying and Pegging-Out at the FSL 292 m asl, placing concrete posts placed along the reservoir perimeter within the seven partially inundated village boundary ( 1.Tha Phae, 2. Nam Yang, 3.Nam Ngorm, 4.Meuang Mouan, 5.Khon Tao, 6. Pha Thong, 7. Na Thoh ).and Topographic survey of village area and land use mapping of thirteen affected villages illustrated on 10,000 scale map.
- Assessment of Land Acquisition and Compensation cost on access road of Nam Theun 1 Hydropower Project.
Nam Ngiep1 Hydropower Project, 261MW, Borikhamxay province, Lao PDR
Date: February- March 2008
Employer: Environmental Research Institute Chulalongkorn University (ERIC), Thailand
Assignment: Social Impact Assessment (SIA) ,
Census survey and asset assessment of Upper Reservoir of Nam Ngiep 1, XiengKhouang province Lao PDR
Nam Song Diversion Hydropower Project, 5 MW Vientiane Province, Lao PDR
Date: July 2009
Employer: Angelique International Limited, India
Assignment:
1. topographic survey covering the project area of about 63 ha at 1: 1,000 scale map with 1m contour interval.
2.longitudinal profile of existing canal of about 1 km at 1:500 scale with cross section at 200 m interval on either side of the canal.
3 .Setting out temporary benchmark
4.The geological investigation to define the structure and texture of soil and rock and its geotechnical data. The scope of work is to execute core drilling including with water pressure test and Standard Penetration Test (SPT) in total of 4 boreholes, test pits in total 7 points and the laboratory test for the purpose of confirming the basic physical, chemical and mechanical characteristics of the collected soil and rock samples.
MINING Projects
Gold Mine Processing Project, Met District,Vientiane Province Lao PDR
Date: 2016-2018
Employer: HONGGUANG MINERALS CO., LTD, CHINA
Assignment: Feasibility study and Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP)
Copper Mining and Processing Project, Bounnua District, Phongsaly Province, Lao PDR. Total area of Nam Yong Copper-Polymetallic Mine is 67.85km2.
Date: December 2013-2014
Employer: ZHENG LIANG JIANGSHEN TRADING AND MINING CO.,LTD, CHINA
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP)
Gold Mining and Processing Project, Sanxay District, Attapeu Province, Lao PDR. .
Date: December 2015-March 2016
Employer: Viet–Lao JoinStock Mining Company, Vietnam
Assignment: Update Environmental Monitoring and Management Plan (EMMP) for 3 km2 concession area
Coal mining project at Gnot Ou District, Phongsaly Province
Date: June -December 2011
Employer: Luithing Lan Xang Construction Co., Ltd. Chinese developer
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP)
Gold Mining and Processing Project, Sanxay District, Attapeu Province, Lao PDR.
Date: 2009-2010
Employer: Viet–Lao JoinStock Mining Company, Vietnam
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP)
Oil Refining Project
Oil products refining project, Saysettha Development Zone Saysettha district, Vientiane Capital. Lao PDR.
Date: 2013-2014
Employer: YUNNAN DONGYAN INDUSTRIAL CO., LTD CHINA
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP)
Plantation Projects
Acacia plantation Project ,Ta Oy District, Saravan province. Lao PDR.
Date: 2009
Employer: The Golden Van Enterprises Ltd., Chinese Hongkong developer
Assignment: Initial Environmental Examination (IEE), 990 ha.
Banana Plantation Project, three plots of land (300ha+400ha+300ha=1,000ha), Houn District, Oudomsay Province, Lao PDR.
Date: 2017
Employer: Chin Chui Agriculture development Co., Ltd., Chinese developer ( ບໍລິສັດ ຈີນຊຸ່ຍພັດທະນາກະສິກຳຈຳກັດ)
Assignment: Initial Environmental Examination (IEE)
Bokeo Rubber Tree Co., Ltd., Bokeo Porvince , Lao PDR , 1,200 ha
Date: 2017
Employer: ບໍລິສັດບໍ່ແກ້ວຢາງພາລາຈຳກັດໂຄງການປູກກ້ວຍ ເມືອງຕົ້ນເຜິ້ງ, ເມືອງປາກທ່າ ແລະ ເມືອງ ຜາອຸດົມ
Assignment: Environment Monitoring and Management Plan (EMMP)
Special Economic Development Zone
Specific economic development zone 1,035 ha at the third Lao-Thai Friendship Mekong Bridge , Thakek , Khamouan Province, Lao PDR.
Date: January-June2011
Employer: Land Development State Enterprise
Assignment: Initial Environment Examination (IEE). The specific economic zone’s objective is to develop modern city with full facilities to draw attention for domestic and foreign investment. Environment and Social Impact Assessment (ESIA) is strongly recommended for this project according to the EIA regulation of Lao PDR.
THAKEK EHSAN INTERNATIONAL COMERCIAL CENTER 7 ha, Thake Specific Economic Zone, khammuan province, Lao PDR
Date: 2016-2017
Employer: Akane Development Lao Sez Co., Ltd. and Malaysia
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Monitoring and Management Plan (EMMP)
VIENTIANE SPECIFIC ECONOMIC ZONE PROJECT, 560 ha, Vientiane Capital, Lao PDR
Date: 2016-2017
Employer: LONG THANH VIENTIANE SPECIFIC ECONOMIC ZONE PROJECT, VIETNAM
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Management Plan (EMP)
Saysettha Integrated Development Zone (SDZ) 1000.06 ha , northeast of the 21 km Industrial Zone (KOKSAAT Industrial Zone) in Xaythany, Vientiane Capital, Lao PDR
Date: 2012-2013
Employer: Lao-China Joint Venture Investment Co., Ltd. (LCC)
Assignment: Environmental and Social Impact Assessment (ESIA) and Environmental Monitroing and Management Plan (EMMP)